A & A Works at Tom Lee Music


Client : Tom Lee Music Co. Ltd.

Consultant : Troika Engineering Limited

Background :
Various upgrading works were intended to improve the services for customers as well as comply with the Building regulations.

Troika's Works :

Wall Signboards at the Tom Lee Shops at Gloucester Road, Wanchai; Cameron Road, Tsim SHa Tsui and Hennessy Road, Causeway Bay

1. Acting as the Authorized Person (AP) and Registered Structural Engineer (RSE) of the projects.
2. Preparation of plan and structural design for steel signboard on external wall.
3. Submission of plan and design to Buildings Department to apply for statutory approval and consent of the construction works.
4. Preparation of tender documents, inviting tenders and assisting in awarding tender and construction contract to the contractor.
5. Supervision and coordination of site works.
6. Submission of all requisite documents and as-built record to the Buildings Department after completion of site works.

Wall opening for piano lifting and various A & A works at the Tom Lee Shop at Gloucester Road, Wanchai

  • Wall opening for piano lifting
  • 1. Acting as the AP and RSE of the projects.
    2. Preparation of structural plan and design calculation for wall opening on external wall and associated lifting beam and protective measures for piano lifting.
    3. Submission of structural plan and design calculation to Buildings Department to apply for statutory approval and consent of the construction works.
    4. Preparation of tender documents, inviting tenders and assisting in awarding tender and construction contract to the contractor
    5. Supervision and coordination of site works.
    6. Submission of all requisite documents and as-built record to the Buildings Department after completion of site works.

  • Acting as the AP and RSE for other A & A works
  • 1. Negotiation with the Buildings Department for removal and replacement of chiller / AC system and steel platform.
    2. Structural stability checking for existing metal cladding under the balcony of the shop front and submission of statutory forms and as/built to the BD after site works.
    3. Submission of statutory forms for proposed floor opening for installation of small lift between floors via Buildings Department's minor work control system.

    Unauthorized Building Works at the Tom Lee Music Store at Cameron Lane, Tsim Sha Tsui
  • Rectification of Unauthorized Building Works
  • 1. Acting as the AP to handle the Buildings Department Order.
    2. Submission of statutory forms to the Buildings Department for rectification of Unauthorized Building Works.
    3. Review of information and record plans.
    4. Preparation and submission of rectification proposal to the Buildings Department.
    5. Site inspection with BD's representative after rectification.
    6. Further site visit and professional advice on removal of internal partition wall.

    Building Inspection for the Music Store at Cameron Lane, Tsim Sha Tsui; Tom Lee's Service Department at Pun Shan Street, Tsuen Wan and Tom Lee's Engineering Department at Mok Cheong Street, To Kwa Wan

    1. Acting as the AP and RSE of the project.
    2. Visual inspection to assess the condition of the building.
    3. Hammer tapping test to the internal walls and ceilings of the building.
    4. Infrared themography Survey to the external walls of the building.
    5. Review of performance of waterproofing on roof.
    6. Based on the inspection and test results, preparation of written report with recommendations on necessary repair / alteration works on the building structure, drainage above ground, and/or fire safety facilities.

    A & A for other Tom Lee Stores

  • Structural stability inspection to the Retail Branch at Olympic City 3, No. 1 Hoi Wang Road, Kowloon.
  • Unauthorized Building Works BD Order handling for the Music Store at Hennessy Road.
  • Design calculation for Wall opening with RSE endorsement for the Music Academy at City One, Shatin.